Thursday, 18 April 2019

Russian Factory , Power Plant

So we decide to add on the power station to the factory (see factory at Targe Show  page). This will allow us to place the generators and boilers into the separate area. More like the original.

So we purchased a plastic injection kit... but again we decided to upgrade it, and make it larger.  We removed the Base and replaced it with mdf. Ensuring it overlapped to give us a pavement. The mdf is about 30 inches x 18 inches.

We covered it with concrete paper in order to blend with the main factory.


We the set to work on the walls. We cut out the windows and excess mould. 
As we wanted the building to fold flat we placed magnetic strips on all the corner's. 

Then covered the wall in brick paper and weathered  them. We 
also re enforced the pillars with balsa.



The pillars were also covered in concert paper and walls with brick paper.


We then used a corrugated iron paper (its a picture repeated and printed) to make the roof. 
See other post on making of the corrugated sheet.

So this some near finished photos...

 We also made some more boilers for the outside.



So it's now looking the part...

Can't wait to see it on the mat... see other posts.









No comments:

Post a Comment